Construction progress details
The progress table comes directly from the WordPress post content.
| SL. No | Name of the work | Progress details |
| 01 | Foundation work | Foundation Completed |
| 02 | Super Structure work | 100% |
| 03 | Block Work | A2 = 80%, B2= 90%, A3 = 90%, B3= 90% ,A4= 90%, B4= 90% ,A5 = 90%, B5= 90% A6= 90%, B6= 90%, A7= 90%, B7= 90%, A8= 90%, B8= 80%, A9=80%, B9= 80%, |
| 04 | Electrical conducting work | A2 = 80%, B2= 90%, A3 = 90%, B3= 90% ,A4= 90%, B4= 90% ,A5 = 90%, B5= 90% A6= 90%, B6= 90%, A7= 90%, B7= 90%, A8= 90%, B8= 80%, A9=80%, B9= 80%, |
| 05 | Door frame fitting work | 100% |
| 06 | Sanitary & plumbing line work | 80% |
| 07 | In side Plastering work | A2 = 30%, B2= 30%, A3 = 80%, B3= 80%, A4= 80%, B4= 80%, A5 = 70%, B6= 90%, A6= 80%, B6= 80%, A7 = 70%, B7= 90%, A8 = 70%, B8= 90% |
| 08 | Electrical cable wiring work | N/A |
| 09 | Wall tiles work | 90% |
| 10 | Common sanitary & Plumbing line work | N/A |
| 11 | Outside plastering work | 90% |
| 12 | Floor tiles/Marble work | 70% |
| 13 | L.C.C work | N/A |
| 14 | Grill & Railing work | N/A |
| 15 | Inside paint & Polishing work | N/A |
| 16 | Switch -Socket fitting work | N/A |
| 17 | Outside paint work | N/A |
| 18 | Door shutter work | N/A |
| 19 | Aluminum work | N/A |
| 20 | Tiles Pointing work & Marble finishing work | N/A |
| 21 | Commode – Basin fitting work and C.P fittings work | N/A |
| 22 | Lift/Generator /Substation /Solar work | N/A |
| 23 | Boundary wall /Ground floor development work | N/A |
| 24 | Roof top finishing work
|
N/A |
| 25 | Roof top Gardening work G.F Garden work | N/A |